Coming soon — Data Migration Agent: agentic data migration, done in weeks, not months See how it works

BLUNOX DATA
Coming soon

Agentic data migration, done in weeks, not months.

A long-running agent that runs the whole migration, not just the mapping. It assesses, plans, converts and rehearses against real data until every control passes, with your team signing off at every gate.

HOW IT WORKS

Six stages, in order, with a sign-off where it matters.

Each stage hands the next one its evidence. Rehearsals repeat until the controls pass, so cutover is the run you have already watched work.

  1. 01

    Assess

    Profiles the source: tables, code, workload and anything that blocks the move. Open questions come to you with a recommendation.

    You accept the assessment
  2. 02

    Plan

    Waves, how each table moves, what “correct” means, the cutover window and the rollback. Change it by asking.

    You sign the plan
  3. 03

    Convert

    Schema and code converted for the target, delivered as a repository you can review, edit and merge. Your edits become overrides it keeps.

    You approve the conversion
  4. 04

    Rehearse

    Full dress rehearsals on real data. Every control runs on both sides, every time, until they all pass.

  5. 05

    Cut over

    The bulk load, then change capture keeps source and target in step until the switch. Rollback stays ready.

    You call go-live
  6. 06

    Close

    A final reconciliation, the record of every decision and sign-off, and the source handed back for retirement.

INCLUDED

Every migration comes with a Blunox engineer.

A forward-deployed engineer joins your team from the first assessment to go-live, at no extra cost. They set the agent up in your environment, work through the controls with your owners and stay through cutover. Larger estates get a small team.

  • Set up inside your environment, with your team
  • Controls and sign-offs worked through with your owners
  • On hand from assessment to cutover and close
Your migration team
  • Data Migration Agentruns the work, around the clock
  • Blunox engineersetup · controls · cutover
  • Your ownerssign off every gate
CONTROLS

Say what “correct” means. It checks it every run.

Write a control as a sentence, such as “balances by account type match”. The agent turns it into checks for both systems, runs them in every rehearsal and shows you what differs.

  • Controls in plain language, compiled for source and target
  • Checks run inside your environment and return pass or fail
  • Differences come with sample keys, not your data
Rehearsal 2 · controls
  1. Row counts match on every table in scope
  2. Ledger totals by month match
  3. Open orders by status match
  4. Balances by account type: one type differsNeeds you
source: sql server · target: postgres · ran on both sides
WHY IT’S DIFFERENT

Other tools hand you a mapping. This agent runs the migration.

Conversion tools generate code and leave the trials, the reconciliation and the risk with your team. That loop is where the months go. The Data Migration Agent runs it continuously, then brings your people the evidence. Autonomous, never unattended.

  • It tests its own work

    Every conversion is trialled against real data and reconciled against your controls before it reaches you.

  • Exceptions ranked by risk

    What it can’t settle lands in one queue, ordered by risk and uncertainty. Accept a rule once for a whole group of columns.

  • Your edits win

    Change the converted code and the change is kept: your override, then the rule, then the default.

  • Runs inside your perimeter

    Checks run where the data is. Results come back as pass, fail and sample keys.

  • A record of every decision

    Who accepted, signed and approved what, and on which evidence, kept for the audit.

  • Rollback planned up front

    The plan you sign includes how to go back, at every wave.

Planning a migration? Plan for weeks, not months.

Tell us the system you’re leaving and where you’re going. We’re taking a small number of design partners.